More Project Information

Meadows School Campus Master Plan and Center for the Arts

Las Vegas, NV

  • Client : The Meadows School
  • Cost : $5.3M
  • Size : 29,000 SF
  • Completion Date : 2000
  • Project Type(s) : Education / Master Plan and Campus Project

BEYOND THE STATS

  • KFA’s long-standing association with the Meadows School began in 1985 with the Campus Master Plan. The first phase, including the completed Master Plan and construction of the Lower and Middle Schools, a gymnasium, and a library, was completed in 1991. The Beginning School was completed in 1999 and the Center for the Arts was completed in 2000.
  • Designed to be the signature building of the school, the Center contains music and art wings, a 340-seat theater, dressing rooms, green room, stagecraft workshop, and a black box theater. A bell tower and entry portico columns topped with large polycarbonate lanterns announce the Center to the students and the school community.
  • Generous outdoor spaces encourage informal interaction and socializing, and can also be used for smaller performances.
NEIGHBORHOOD FAVORITE : Omelet House

All Projects