down-arrow up-arrow

Meadows School Campus Master Plan and Center for the Arts

Las Vegas, NV

  • Client : The Meadows School
  • Cost : $5.3M
  • Size : 29,000 SF
  • Completion Date : 2000

BEYOND THE STATS

  • KFA’s association with the Meadows School began in 1985 with the development of Campus Master Plan. The first phase, including the completed Master Plan and construction of the Lower and Middle Schools, a gymnasium, and a library, was completed in 1991. The Beginning School was completed in 1999 and the Center for the Arts was completed in 2000.
  • Designed to be the signature building of the school, the Center contains music and art wings, a 340-seat theater, dressing rooms, green room, stagecraft workshop, and a black box theater. A bell tower and entry portico columns announce the Center to the students and the school community.
  • Generous outdoor spaces encourage informal interaction and socializing, and can also be used for smaller performances.
NEIGHBORHOOD FAVORITE : Omelet House